Keystone Roofing Co.Roof repair and replacement across San Juan Capistrano, CA.(949) 868-1671Get my price

Guide

What to ask before you sign anything

Ask all three contractors the same list. Comparing the answers is far more revealing than comparing the totals.

Or call (949) 868-1671
Guide7 sections1 min readSan Juan Capistrano, CA

Get it looked at

Three questions, and up to three San Juan Capistrano contractors. Free either way.

Or call (949) 868-1671

No obligation · No cost to you

Get it looked at

Three questions, and up to three San Juan Capistrano contractors. Free either way.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

No fee, no obligation, nothing to cancel.

"What does your workmanship warranty cover, and for how long?"

Ask for it in writing, in the company name, with a term. Five to ten years is common; the term matters less than whether they will still be trading.

"Who is actually doing the work?"

Employees, or subcontractors? Both are fine, but subcontracted crews change who carries the workers compensation cover and who stands behind the workmanship warranty.

"What underlayment, and how are the valleys done?"

This is the question that reveals whether you are comparing the same roof. Underlayment, ice-and-water placement, drip edge and valley treatment are where quotes quietly diverge.

"What is your licence number, and who holds it?"

The follow-up matters more than the answer: does the entity on the licence match the entity on the paperwork, and is it active today?

"Can I see a job you finished five years ago?"

Anybody can show you a roof completed last month. A roof that has been through five winters shows how the edges, valleys and penetrations were actually detailed.

"What happens if the decking is rotten?"

The right answer is a specific price per sheet, written into the contract before work starts. A vague answer here is how a fixed price stops being fixed on day two.

In short

Write the answers down. Two weeks later, when the quotes have blurred together, the notes are what you will actually decide on.

Related questions

How long does a re-roof take?

Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.

Can I just put a new roof over the old one?

Codes in most places allow two layers. That does not make it wise. You lose the chance to see the deck, and the next roofer has twice as much to remove.

It is leaking right now. What do I do?

Contain the water, photograph everything, and get the request in marked as an emergency. A tarp is the right first job. The permanent repair is a separate conversation and a separate price.

Get the roof looked at

Three questions, about a minute, and up to three San Juan Capistrano contractors come back to you.

(949) 868-1671Call nowGet my price