What to ask before you sign anything
Ask all three contractors the same list. Comparing the answers is far more revealing than comparing the totals.
Or call (949) 868-1671Get it looked at
Three questions, and up to three San Juan Capistrano contractors. Free either way.
Your request is in.
We are matching it now against roofing contractors working in San Juan Capistrano and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
"What does your workmanship warranty cover, and for how long?"
Ask for it in writing, in the company name, with a term. Five to ten years is common; the term matters less than whether they will still be trading.
"Who is actually doing the work?"
Employees, or subcontractors? Both are fine, but subcontracted crews change who carries the workers compensation cover and who stands behind the workmanship warranty.
"What underlayment, and how are the valleys done?"
This is the question that reveals whether you are comparing the same roof. Underlayment, ice-and-water placement, drip edge and valley treatment are where quotes quietly diverge.
"What is your licence number, and who holds it?"
The follow-up matters more than the answer: does the entity on the licence match the entity on the paperwork, and is it active today?
"Can I see a job you finished five years ago?"
Anybody can show you a roof completed last month. A roof that has been through five winters shows how the edges, valleys and penetrations were actually detailed.
"What happens if the decking is rotten?"
The right answer is a specific price per sheet, written into the contract before work starts. A vague answer here is how a fixed price stops being fixed on day two.
In short
Write the answers down. Two weeks later, when the quotes have blurred together, the notes are what you will actually decide on.
Related questions
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
Can I just put a new roof over the old one?
Codes in most places allow two layers. That does not make it wise. You lose the chance to see the deck, and the next roofer has twice as much to remove.
It is leaking right now. What do I do?
Contain the water, photograph everything, and get the request in marked as an emergency. A tarp is the right first job. The permanent repair is a separate conversation and a separate price.